Athletics Runways Product Data Sheets & Downloads
Technical guides, installation specifications, and construction standards for athletics runways, landing pits, and throwing circles are collected here. Whether you are planning a new long jump or triple jump runway, specifying a landing pit, or looking for guidance on throwing circle construction, you should find what you need below. If you cannot find what you are looking for, or would prefer to talk through your requirements, our team are happy to help. Simply call us on 01858 545789 , email us at [email protected] or send us a message via our website.
| Data Sheet | Description | Related Product |
|---|---|---|
| Long Jump / Triple Jump Runway Installation Information | Installation guidance for rubber-surfaced long jump and triple jump runways, covering take-off boards, troughs and blanking boards. Note: this guide is not suitable for shale or carpet-surfaced runways. | Runways & Landing Pits |
| Standard Single Long Jump Runway Specification | Construction specification for a standard single long jump runway suitable for school and college use, covering excavation, base, surfacing, and take-off board installation. | Runways & Landing Pits |
| Standard Single Long Jump Landing Pit Specification | Construction specification for a standard single long jump landing pit, covering excavation, kerbing, drainage, and sand fill requirements. | Runways & Landing Pits |
| Required Equipment and Installation Advice for Throwing Circles | Guidance on the equipment required and installation considerations for shot, discus, and hammer throwing circles. | Throwing Cages, Netting & Circles |
| SAPCA Construction and Maintenance of Athletics Tracks (opens in new window) | The Sports and Play Construction Association's code of practice for the construction and maintenance of athletics tracks, produced independently of sportsequip. | SAPCA |
|
< Return to Downloads, Resources & Data Sheets
|


